Interior Remodeling Job Under Construction:

NOTE: THIS PAGE UNDER CONSTRUCTION USE CAUTION!

Click on any picture to take you to the Finish Job Page:

Remember as on all my pages you can link back or e-mail from the bottom of the page.

Note: More pictures under construction may follow.

 
 This picture shows the shape of the wall to the right of the tub (hard to see in finished photo) and the shower and vanity walls. Also shown is the channel we had to make in the floor to move the plumbing drain lines.
 
   This picture shows the tub resting on the platform with the drain connected. You can also see the pocket door frame and the shower door frame and step. The space on the back wall between the tub and shower can be used for a linen closet or as open shelves for towels. That is how I designed that space. It's not currently being used, it's just a wall.
   This picture shows the master bedroom doorway and wall under construction. Also shown is the electric supply for the lighting and fan. Click on this picture to see the same angle picture as a finished product.
   
   
   
   
   

Click here to return to Interior Remodeling Job Page.

 Click here to return to Job Picture Page.
 Click here to send E-Mail to Scott Singer Installations, Inc.
 Click here to return to Scott Singer Installations, Inc. Home Page.
 Click here to return to Scott Singer's Main page.